Dass167 Patched May 2026
They sanctioned a field trial: two fleets would run parallel for a month—one with the centralized daemon, one with device-specific patches. DASS167 led its cohort into the old manufacturing belt, a place of magnetic storms and twisting debris where they could test adaptive repair in earnest without risking lives.
